Accountability

Background

From accountability to action – the role of management

7 October 2016

7 October 2016 | Minutes

Panellists:

Daniel Peters – US Treasury, formerly worked at US World Bank ED’s office

Lalanath de Silva – incoming head of Green Climate Fund independent redress mechanism

Kate Geary – BIC Europe

Osvaldo Gratacos – CEO CAO

Presentations:

Green Climate Fund (GCF):

  • Had served in compliance panel of ADB from where he is departing. Has done research on compliance mechanisms from the CSO side.
  • Many similarities between IFC and GCF – as both focus on use of financial intermediaries (FIs), which is a challenging area.
  • Difference – GCF has very specific mandate from UNCCC to fund transformative projects.
  • Engagement of management in projects – Management is perceived as not working closely with CSOs as generally don’t see it as function of management – rather of states or client. Tend to engage only reactively when problems are identified. This is not sufficient. Does not foster relationships.
  • In complaint process, or compliance side, early engagement of management is very important. In ADB this happens – special project facilitator – engages management and complainants. At IFC interaction happens late in the day. Recommends earlier involvement of management as this avoids entrenched positions.
  • In general, management response to issues identified has not been good. Management is required to develop an action plan. In ADB – formerly panel responsible to produce recommendations for remedial actions was opposed by management and disbanded. Some plans result in little or no action. Better effort required of management.
  • Management responsiveness begins at project design stage – it must have capacity to address issues. This is why institutions have safeguard units. Unfortunately – there is little capacity at the design stage – ES staff are not empowered. Internal personal management, and incentives are barriers – may speak up, but may not take a strong stand at the design stage.
  • What is meant by accountability: preventive systems; corrective actions (CAO, etc); punitive or sanctions area (element not covered by mechanism) should be dealt with internally by management however. In many cases of gross negligence staff are not punished and are instead promoted.

BIC:

  • Presentation of findings of Glass Half Full report
  • Overview of serious harm caused to communities. Report finds that “Outcomes of complaints rarely provide adequate remedy for harms suffered”
  • Focus on prevention – need to make IFI involvement clear. IFC FI investments are not transparent.
  • IFIs should not rely on client systems or reporting alone. Currently persistent over-reliance.
  • Need to ensure that projects are rejected if there are serious concerns.

Responding to harms

  • Some positive examples of management intervention – Mumbai Urban Transport.
  • Sometimes response is commensurate – suspension of loans to Cambodia.
  • Suspension of palm oil investments.
  • When audits find that harm has been done, the rejection of audit findings in adding insult to injury.
  • GHF report found that Action Plans were developed in only 7% of cases. Varied quality of plans – lack of consultation with communities in development of action plans remains a key shortcoming. They should mandatory in every case.
  • Need to ensure that communities are protected from reprisals. IEB has an appeal mechanism when communities disagree.
  • Allow space for IAM – eg, management should push governments and clients to engage with IAM and open space for site visits.

Fundamental observations:

  • ‘Human rights free zone’ – IFI standards are not compatible with international human rights law.
  • Perhaps IFIs will not learn lessons until they are forced to pay. Need to lift immunity of IFIs.
  • Need to make recommendations binding.

Word to Tata Mundra community member related community experience with IFC process.

  • Noted that community was not provided CAO report
  • IFC did not visit the community. This is insulting
  • At least ADB visits the community and conducts studies – disagrees with findings, but appreciates that they visit.
  • The lack of response from IFC is very disappointing to community members.
  • Depleted fish catch.
  • Double standards – use of dubious EIA agency which is being used by both ADB and IFC.

US Treasury:

  • US is interested and engaged in MDB/ IAM. Looking at GCF mechanism.
  • Shares similar concerns as others. Perspective of shareholder (previously at US ED’s office). Now working at Treasury on accountability issues.
  • There is a need for a proactive preventative approach – work with clients- consultations, ensure clients have robust ESMS of clients; need for redress mechanisms within projects.
  • Disclosure and IFI access for communities. Communities must know when/ whether IFIs are involved. This should help in early identification of issues.
  • When formal complaints take place it is incumbent on management not to be defensive or take legalistic approach. Should focus on need to remedy issues. Particularly given institutions have privileges and immunities.
  • Must respond adequately to findings.
  • Two cases presented: Bad: Meduki power plant in South Africa – Inspection Panel – par excellence example of legalistic approach. Good case: Dinant – IFC management was initially reluctant but has now developed a good action plan.
  • Role of the Board: There may be cases that the Board must step in. This does not happen frequently. Institutions must be accountable, as they are eventually responsible.

Chair:

Focus on prevention is key. Represents Mongolia – which would appreciate support in responding to cases. At times Board speaks as it is separate from management. Agrees that immunity and privileges seem at odds with approach to private sector and that lifting immunities and privileges would perhaps focus the minds of Board members.

CAO:

  • Too much attention focused on reaction to problems. Accountability is not an outcome but a state of mind.
  • Role of management is multi-faceted. Start with disclosure. Disclosure is imbedded into all institutions, including safeguards. Community engagement and participation at the front end. Hear the words of ‘inclusive development’ often – need for consultation.
  • Need to focus on project-level grievance mechanism. At CAO, this is not always the case – allows clients to identify issues.
  • Course-correction – Not a back-end approach. It has entry points at every stage of the project cycle.
  • Complaints and mechanisms should be last resort. What is the role of management in dispute resolution mechanism? Management should not fear CAO or IAM mechanism involvement.
  • Lack of acknowledgement by management is of the difficulties faced by communities in bringing cases to light is very troubling – bringing forth complaints is stressful, difficult and potentially dangerous. Management must recognise this is the case. Communities must be included in solution framework. Need for clear justification by management where disagreement arises. Management responses tend to be open-ended. Must be time-bound and clear.
  • Non-compliance must be addressed by client – through management support and pressure. Need to internalise ‘lessons learned’.
  • There have been some positive steps taken, however there remains a need to ensure action plans are develop at the specific project level.

Discussion:

IFC – Morgan Landy:

  • IAMs are core. CAO is core part of IFC. Proud that CAO the ‘best in class’ mechanism. Agrees with need for better management involvement at an earlier stage. Would support more use of dispute resolution. In the past staff were less sure about their involvement at early stages.
  • Noted recent example of Albania where staff have been involved at an early stage and have visited the project several times to address issues of concern.
  • Working to internalise findings and experiences in cases where complaint becomes a compliance issue –IFC has been asked to increase engagement in IDA and FCS, therefore learning is essential.
  • IFC has posted a new document on lessons learned on its website.

Questions:

  • To what extent has the change of mentality vis-à-vis acceptability of bringing up problems been internalised by the organisation? Need to change incentive structure away from focus on project pipeline.
  • Frustration with president Kim’s performance at town hall meeting. It seems many people within the institutions need support.
  • IDA replenishment – how will ES framework work in FCS. Has the balance between financial and ES risk at FCS been analysed and a new mechanism developed to deal with the complexities of fragile countries?
  • Part of difficulty with process centres on client selection – Private companies would react positively to a clear, well-publicised and consistent framework.
  • There is a need to ensure that all voices are heard in investigations – eg. FICOHSA and Dinant. Representatives from both should be invited to attend and provide their perspectives.

Question to Board: what is the responsibility of board in regard to brining non-compliant projects into compliance and ensure remedy.

IFC response:

  • Everything that IFC finances is available prior to project approval as projects are listed on the website 60 to 90 days prior to approval. Appreciates need to focus on incentive. New CEO is very focused on development impact. Agree that all staff need same incentives.
  • Emphasise that IFC is changing – eg – heavy participation of IFC staff at recent civil society roundtable event.

Board response:

  • Board seeks to ensure compliance through safeguards. It is the Board’s responsibility to bring projects back into compliance. Concerned in constituency that some small countries will not have resources to implement safeguards.

More background on this issue

Accountability

Background

7 October 2016 | Minutes

From accountability to action – the role of management

Notes from a side event at the IMF/World Bank 2016 annual meetings on the role of management in ensuring development banks responds appropriately to community complaints.

IFI governance

Background

2 February 2015 | Inside the institutions

Guide to the IMF's Independent Evaluation Office

Understanding the Independent Evaluation Office of the IMF, including how it works and how civil society can input into its evaluations.

Accountability

Background

10 April 2014 | Minutes

CSOs - Inspection Panel meeting and discussion

Accountability

Background

29 April 2013 | Minutes

UK civil society meeting with UK World Bank Executive Director Gwen Hines

Notes of a meeting with UK executive director to the World Bank Gwen Hines in April 2013

Accountability

Background

22 April 2013 | Minutes

Bending the arc of poverty

The session focused on the World Bank's development strategy, poverty eradication goals, global inequality, and the threat of climate change.

Accountability

Background

22 April 2013 | Minutes

Financial and housing crises, the Bank's safeguards and the right to adequate housing

This session featured a presentation from UN special rapporteur on the links between financial and housing crises, safeguards and the right to adequate housing.

Accountability

Background

22 April 2013 | Minutes

The challenges of advancing sustainability at the World Bank

This panel discussion reflected on the major sustainability challenges facing the World Bank through exploring two World Resources Institute areas - a portfolio analysis on 2012 projects, and the interaction between country systems and World Bank safeguard approaches.

Accountability

Background

19 April 2013 | Minutes

World Bank executive directors roundtable with CSOs

Minutes of an open roundtable with EDs that occurred during the 2013 spring meetings.

Accountability

Background

19 April 2013 | Minutes

The private sector and poverty eradication

Minutes of an IFC event at the World Bank / IMF 2013 spring meetings

Accountability

Background

18 February 2013 | Minutes

UK Civil Society Meeting with Minister of State Rt Hon Alan Duncan MP

This was a meeting on 1 October 2012, between the Minister of State of the UK's Department for International Development (DFID) and civil society representatives, focusing on the World Bank.

Accountability

Background

6 December 2012 | Inside the institutions

World Bank corporate scorecard

Every six months the World Bank issues a corporate scorecard, which is submitted each Autumn to the Bank's annual meetings. The scorecard is supposed to "provide a snapshot of the Bank's overall performance, including its business modernisation, in the context of development results." It is compiled by Bank staff to "facilitat[e] strategic dialogue between management and the board on progress made and areas that need attention."

Accountability

Background

3 November 2012 | Review

Climate Investment Funds Monitor survey

The Bretton Woods Project launched the twice-yearly Climate Investment Funds (CIFs) Monitor in 2010 to track the development of the CIFs and highlight concerns. As it approaches our third year, we would like your input into how we can improve the CIFs Monitor to ensure that it remains a valuable resource for civil society and other interested stakeholders of the CIFs.

Accountability

Background

12 October 2012 | Minutes

IMF consultation meeting on engagement with civil society: review and way forward

This session sought to gather CSO views, suggestions, and concerns on how to improve the current guidelines, including IMF consultation processes on policies, strategies, and Article. IV consultations

Accountability

Background

11 October 2012 | Minutes

Global financial regulations and their Impact on major campaigns

This event was a collegial information-sharing and strategy session to explore the linkages between financial regulations and grass roots campaigns.

Accountability

Background

3 August 2012 | Minutes

IFI re-engagement in Burma

Minutes of Burma and IFIs meeting, Washington DC, 18 April 2012

Accountability

Background

23 April 2012 | Minutes

EIR + 10

Minutes of afternoon sessions of extractives conference, Washington DC, 23 April 2012

Accountability

Background

21 April 2012 | Minutes

Lessons from IEG's Cluster Review of IFC-supported Extractive Industries Projects

Minutes of IFC and extractives meeting, Washington DC, 21 April 2012

Accountability

Background

21 April 2012 | Minutes

Safeguards in a Changing Landscape

Minutes of safeguards meeting, Washington DC, 21 April 2012

Accountability

Background

19 April 2012 | Minutes

Supporting Social Accountability for Better Results

Minutes of World Bank Social accountability plenary, Washington DC, 19 April 2012

Accountability

Background

19 April 2012 | Minutes

Development Policy Lending (DPL) Retrospective consultation

Minutes meeting, Washington DC, 18 April 2012

Accountability

Background

18 April 2012 | Minutes

UK civil society meeting UK IMF Executive Director Alex Gibbs

Notes of a meeting with UK executive director to the IMF Alex Gibbs in April 2012

Accountability

Background

12 October 2011 | Minutes

UK civil society meeting with HM Treasury and UK IMF Executive Director

Notes meeting Alex Gibbs September 2011

Accountability

Background

23 September 2011 | Minutes

CSO Townhall with Robert Zoellick and Christine Lagarde

Notes of meeting, Washington DC, September 22, 2011

Accountability

Background

15 September 2011 | Minutes

Notes of meeting between UK Executive Director to World Bank and Civil Society Groups

Civil society organisations met UK Executive Director to the World Bank and staff from the Department for International Development to discuss water, the Bank's private sector approach, health and nutrition, safeguards review and energy strategy.

Accountability

Background

18 April 2011 | Minutes

Consultation on Program for Results (P4R)

Notes of meeting, Washington DC, April 16, 2011

Accountability

Background

18 April 2011 | Minutes

IFC and Financial Intermediary Lending

Notes of meeting, Washington DC, April 15, 2011

Accountability

Background

14 April 2011 | Minutes

Notes of meeting between UK Executive Director to World Bank and Civil Society Groups

Civil society organisations met UK Executive Director to the World Bank and staff from the Department for International Development to discuss the World Development Report on conflict, security and development; the spring meetings and food security; the World Bank's energy strategy and performance in the health sector.

Accountability

Background

7 March 2011 | Minutes

Notes of meeting between UK Executive Director to World Bank and Civil Society Groups

On February 2nd 2011 civil society organisations held a meeting with the UK Executive Director to the World Bank and staff from the Department for International Development to discuss the formation of the new Green Climate Fund, the World Bank energy startegy review, and the role of the private sector in World Bank lending.

Accountability

Background

4 October 2010 | Minutes

Meeting on the World Bank between DFID and UK NGOs

Notes of a meeting between UK civil society and DFID staff.

Accountability

Background

19 July 2010 | Minutes

Meeting of UK NGOs and Susanna Moorehead, UK Executive Director to the World Bank, and Rachel Turner

Notes of the meeting

Accountability

Background

26 April 2010 | Minutes

A sustainable World Bank energy strategy: perspectives from various stakeholders

Civil society event at the World Bank spring meetings 2010, 23 April

Accountability

Background

26 April 2010 | Minutes

Evaluation as a critical tool for accountability

Civil society event at the World Bank spring meetings 2010, 23 April

Accountability

Background

6 April 2010 | Minutes

Meeting between UK civil society and Susanna Moorehead, UK Executive Director to the World Bank

Minutes of a meeting between UK civil society, UK World Bank Executive Director Susanna Moorehead, and DFID staff

Accountability

Background

30 March 2010 | Minutes

Meeting between UK civil society and Alex Gibbs, UK IMF Executive Director

Minutes of a meeting between UK civil society, UK IMF Executive Director Alex Gibbs, and UK Treasury staff

Accountability

Background

3 March 2010 | Minutes

Informal discussion between Rachel Kyte, IFC's Vice President for Business Advisory Services, and NG

Discussion of IFC and the financial crisis, climate change, performance standards and financial intermediaries

Finance

Background

15 February 2010 | Inside the institutions

IDA replenishment

This year, donor countries will decide on their financial contributions to the World Bank's International Development Association (IDA) for 2011-2014.

Accountability

Background

8 October 2009 | Minutes

IMF governance - CSO meeting with the IMF managing director

Minutes of a meeting between civil society organisations, IMF managing director Dominique Strauss-Kahn and IMF deputy managing director John Lipsky

Accountability

Background

29 September 2009 | Minutes

Videoconference between UK civil society and Alex Gibbs, UK IMF Executive Director

Minutes of a meeting between UK civil society, UK IMF Executive Director Alex Gibbs, and UK Treasury staff

Accountability

Background

22 September 2009 | Inside the institutions

Safeguard policies and performance standards

Originally drafted as internal operational policies to guide staff, World Bank safeguard policies evolved after pressure from environmental and social groups in the 1980s and were first officially implemented in 1998. They aim to protect people and the environment from the adverse effects of Bank-financed operations and are based on international agreements, even if these protections are not explicitly provided for in the borrower country's national law.

Accountability

Background

27 April 2009 | Minutes

IFC and broad community support

Minutes of a session hosted by the IFC at the World Bank spring meetings, April 23, 2009

Accountability

Background

23 April 2009 | Minutes

Meeting between UK civil society and Douglas Alexander, Secretary of State for International Develop

Minutes of a meeting between Douglas Alexander, Secretary of State for International Development, and UK NGOs, 21 April 2009

Accountability

Background

20 April 2009 | Minutes

Meeting between UK NGOs and Susanna Moorehead, UK World Bank Executive Director

Minutes of a meeting between UK civil society and UK World Bank Executive Director Susanna Moorehead

Accountability

Background

15 April 2009 | Minutes

Meeting between UK civil society and Alex Gibbs, UK IMF Executive Director

Minutes of a meeting between UK civil society, UK IMF Executive Director Alex Gibbs, and UK Treasury staff

Accountability

Background

9 October 2008 | Minutes

Transparency at the World Bank and IMF

Links to GTI principles, reviews of Bank performance on transparency, and a new paper on IMF transparency.

Environment

Background

25 July 2008 | Minutes

Highlights: Meeting of UK NGOs with UK Alternate Executive Director to the World Bank

Meeting between UK NGOs and UK Alternate Execituve Director to the World Bank -Caroline Sergeant- on July 22, 2008.

Accountability

Background

22 February 2008 | Minutes

BWI-UK / UKAN workshop on World Bank strategic review

Highlights of a 13 February 2008 UK NGO workshop discussing elements of the World Bank's long-term strategic review.

Accountability

Background

26 October 2007 | Minutes

Rethinking the governance of the IMF

Highlights of a 19 October discussion on the reform of IMF governance at the World Bank-IMF annual meetings 2007.

Accountability

Background

26 October 2007 | Minutes

The role of low-income countries in IFI governance

Highlights of a 19 October discussion on the role of low-income countries in IMF governance at the World Bank-IMF annual meetings 2007.

Accountability

Background

25 June 2007 | Minutes

Highlights of UK NGO meeting with UK Executive Director to the WB/IMF Tom Scholar

Highlights of a 22 June 2007 meeting between UK NGOs and UK executive director to the World Bank and IMF, Tom Scholar. Issues covered included review of the Bank's transport strategy, avoided deforestation, conditionality, debt, social protection and IFI governance.

Accountability

Background

15 November 2006 | Minutes

Global Transparency Initiative (GTI) - regional launch

This is a summary of the Global Transparency Initiative (GTI) regional launch held at Westminster on the 2nd of November 2006.

Accountability

Background

21 September 2005 | Minutes

CSO discussion with IFC/MIGA Compliance Advisor Ombudsman

Accountability

Background

25 May 2003 | Inside the institutions

Citizen complaint mechanisms in the World Bank Group

A brief outline of the workings of the Inspection Panel and the Compliance Adviser Ombudsman, the two principal complaint mechanisms of the World Bank.

Latest articles on this issue

Accountability

Analysis

A proposal for Ajay: No evolution without remedy

While World Bank President declares the benefits of a “bigger and better” Bank, the scandal of alleged child sexual abuse and cover up relating to IFC investments in Bridge Academies demonstrates the urgent need for the Bank to establish a robust remedy framework.

13 December 2023

Accountability

News

UDHR and IPN anniversaries underscore urgent need for Human Rights policy at all IFIs

World Bank and IMF shareholders must use the anniversaries of the Inspection Panel and the Universal Declaration of Human Rights respectively to demand both establish human rights policies and meet their international obligation to provide remedy

19 July 2023

Accountability

News

Demanding accountability: Response to reports of a child sexual abuse cover up at the World Bank

A joint statement from 34 global civil society organizations regarding the extremely disturbing reports of a child sexual abuse cover-up by World Bank Group officials in connection with IFC's investment in Bridge International Academies in Kenya.

19 October 2023 | Letters

Land

News

Honduras threatens ICSID withdrawal over $11 billion ‘neo-colonial’ special economic zone claim

Compensation claim before WorldBank’s ICSID raises questions about the value of special economic zones and fairness of ISDS mechanisms for Global South states.

19 July 2023

Accountability

News

World Bank’s accountability mechanisms - still a long way to go

57 CSOs highlight need for operational changes in the World Bank’s new accountability scheme to ensure its effectiveness.

4 October 2022

Accountability

Analysis

Ending “absolute immunity” for the International Finance Corporation: The legacy of Jam v. IFC

EarthRights International examines how the Jam v. IFC case has helped to shift the landscape of accountability for international financial institutions by successfully challenging their claim to “absolute” immunity in US courts, potentially opening IFC up to further legal challenges in future.

21 July 2022 | At Issue

Accountability

Commentary

The IMF is changing and needs an independent ombudsman

The Fund's expansion of its work into the macro-stability challenges posed by pandemics, climate change, gender discrimination and inequality increases the risks that it may negatively impact communities and individuals.

21 July 2022 | Guest comment

Accountability

Analysis

Why the IFC can’t afford to squander this opportunity to get remedy right

The IFC is the only DFI that has committed to creating a remedy framework. The basic requirements of a rights-based remedy framework are already known.

21 July 2022 | Guest analysis
Ecosistemas advocates protest against Alto Maipo project before IFC building.

Accountability

Commentary

Alto Maipo: Harms endure due to MDBs' lack of proper due diligence

World Bank and Inter-American Development Bank's reactive independent accountability mechanisms cannot address harms caused by lack of proper due diligence in Alto Maipo.

9 December 2021 | Guest comment

Accountability

News

World Bank’s new Accountability Mechanism: One step forward…?

Mixed reactions on new World Bank Accountability Mechanism as civil society welcomes incorporation of dispute resolution function but is concerned about possible erosion of Inspection Panel independence.

22 September 2021