Better standards, better projects? New evidence and real-world lessons for successful IFC investments

•

Photo from CSPF event titled 'Better standards, better projects? New evidence and real-world lessons for successful IFC investments' held on 14 October 2026.

Article summary

Notes from the Civil Society Policy Forum session titled, Better Standards, Better Projects? New Evidence and Real-World Lessons for Successful IFC Investments on 14 October 2026. As the International Finance Corporation (IFC) revises its Sustainability Framework for the first time in over a decade, this session drew on new case studies from Nigeria, Burkina Faso and the Philippines, and the Independent Evaluation Group’s (IEG) recent evaluation, to ask what happens when environmental and social (E&S) standards are implemented well – and when they fall short.

Moderator

Panellists

A video recording of the event is available here.


Ash: Nearly 90 per cent of the world’s cement is consumed in the global South, where industrial investment decisions made today will shape economies, emissions and communities for decades. The IFC’s standards influence development finance far beyond its own portfolio, and their revision is a consequential opportunity to define what climate accountability should require. Industrious Labs and partners examined nearly 20 IFC projects. We found that the IFC often has relevant climate information, but it doesn’t consistently determine what gets financed or provide a basis for judging what happens afterwards. A project may improve energy efficiency while expanding production enough to raise absolute emissions, with little public record of how that trade-off shaped the decision. After approval, obligations and evidence of performance become hard to trace – especially through banks and funds – and consultation may be documented without showing whether it influenced anything. Our forthcoming report recommends that the IFC assess lower-emission alternatives before approval; turn material climate commitments into enforceable obligations with measurable targets; compare actual performance against them, disclose results and require corrective action; extend these requirements to intermediated finance; and give communities real influence and access to results. This complements IEG’s findings on implementation gaps, outcome tracking, disclosure and intermediary oversight.

Smith: Our research looked at BUA Cement in Nigeria, where community members told us they were not properly consulted before the project and its expansion. Had they been, their input would have shaped the project’s design. Instead, they are living with a host of problems: buildings sit close to the facilities and are cracked by heavy trucks, the noise continues through the night, and residents report that the water level, once around two to three metres below ground, has fallen to about 70 metres since the expansion. Meaningful consultation would have made the project better for both the communities and the company.

Laetitia: The IFC has approved a green loan of over €30 million for a calcined clay plant in Burkina Faso, where cement demand exceeds one megatonne a year. Since around two-thirds of cement emissions come from clinker, replacing part of it with local calcined clay could cut CO2 by up to 30 per cent. The project has not yet started. Most people we spoke to had not heard of it, had not been consulted and did not know how to raise grievances – yet they are hopeful, want local jobs and dialogue, and are concerned about dust and traffic. The IFC should publish verifiable climate indicators, track local benefits such as hiring and training, and ensure engagement is real. Well monitored, this project could become a benchmark for Africa.

Aaron: A community leader from Bataan, here in Bangkok, recently buried a friend who died of lung complications the community attributes to coal plant exposure; she herself is under military surveillance. In Mindanao, an Indigenous community lost its drinking water to coal ash and has since been displaced and fenced off from its homes and places of worship. These are among ten communities found eligible under our 2017 complaint to the Compliance Advisor Ombudsman (CAO), covering 19 coal plants – 16 eventually built – financed indirectly through the Rizal Commercial Banking Corporation (RCBC). We won in 2021, and the CAO found the IFC violated six of its eight Performance Standards. A Management Action Plan followed in 2022, but no relevant interventions have reached the 120,000 Filipinos in the direct impact areas. We refuse to be a mere lesson learned: there must be reparations. The Philippines has been the deadliest place for land and environmental defenders for 13 years – new investments compound that harm.

Martin: IEG reports directly to the World Bank Group board rather than management. Our evaluation of the IFC framework, presented in July alongside our evaluation of the World Bank’s Environmental and Social Framework (ESF), found a mixed picture. Four findings stand out. First, the framework remains a strong foundation – it was the prototype for DFIs – but it is now a 16-year-old car. Projects generally performed well where the IFC identified risks early and provided hands-on support, but implementation is uneven, and stronger language alone will not produce better projects without supervision and capacity. Second, the greatest weaknesses are on social issues and transparency: stakeholder engagement, labour, community health and safety, grievance management and disclosure. A grievance mechanism existing does not mean people can use it safely or obtain remedy, and disclosure weakens sharply after approval. 

Climate is treated as a cross-cutting issue rather than through a dedicated standard, and among 53 underperforming direct investments, water pollution featured in 42 per cent, occupational health and safety in 34 per cent, and air emissions and greenhouse gases in 11 per cent. Third, around 53 per cent of IFC financing now flows through financial intermediaries, where the IFC has significant gaps in visibility, so the framework must make explicit who is responsible for what along the chain and what the IFC does when client systems fail. Fourth, the IFC needs to move from showing that processes were completed to showing that they produced results – that workers are safer, pollution has fallen, vulnerable groups were protected and grievances were resolved without retaliation.

Ash: Looking ahead, what should the revised framework require so that commitments translate into results on the ground?

Smith: It should go beyond companies disclosing commitments to ensuring those commitments are fulfilled. That means an independent monitoring mechanism that checks what companies promised against what happens on the ground, including who was consulted and whether their concerns were reflected. Commitments also need to be explained in language residents understand – people know their land and its landmarks, and if their knowledge is taken into account, the impacts of a plant can be minimised.

Laetitia: When projects change during implementation, the company and the IFC must explain the consequences for people and the environment. The IFC should publish a clear baseline and milestones, measuring progress at each – including clinker replacement rates. Above all: more transparency and communication.

Aaron: The IFC must acknowledge its leverage. It denied having any over RCBC, yet it invested around $48 million in 2011 and a further $100 million two years later, raising its stake from 7 to 12 per cent and gaining a board seat – and still did not use that leverage to enforce standards or secure remedy. When it divested last December, its responsible exit principles were not applied. The Performance Standards don’t need rewriting so much as enforcing: RCBC had no E&S management system until after our complaint. And access to information must be fixed: we helped draft the 186 recommendations on implementing the action plan, yet were denied the final report. There is no access to information when communities are left in the dark.

Martin: The framework was designed for direct financing and the caravan has moved on. Other DFIs already handle sub-project risk better; it’s not rocket science. The IFC should close implementation and supervision gaps, fill policy gaps, clarify responsibilities in intermediary and capital markets operations, and track and disclose results – including whether communities influenced decisions and whether grievances led to timely remedy.

Questions and answers

Representative from Oxfam: Could IEG be more specific on what hands-on E&S support and better staff incentives mean in practice?

Representative from Bank Information Center: With no standalone climate standard, climate is like the Holy Spirit – present, but we don’t know where. Will the IFC adapt when communities raise problems during implementation? That requires culture change, not just policy change.

Martin: I cannot speak for IFC management, though it has accepted all of our recommendations. What we point to is adequate resourcing of the E&S function, decentralised so that expertise is present during supervision, which is where we found the biggest mismatch – reporting from financial intermediaries is often delayed by months or even years. There is also strong evidence that combining investment with advisory services improves both investment and development outcomes, so in high-risk settings advisory support should be part of the solution. The ethics of intention are there, but the spirit is willing and the flesh is weak.

Representative from Arab Watch Coalition: In the Philippines case, requests for the action plan were refused at every stage under a non-disclosure agreement, and the bank threatened legal action over a redacted version. What counts as commercially sensitive? Older versions of E&S action plans are also removed from the IFC website without record of waivers or extensions – anyone monitoring a project should save every version.

Representative from Banneker Capital: Project documents often appear to address every factor. Where exactly does the gap between plan and implementation open up – contractors, technology, optimistic plans, or consultation that doesn’t reach people?

Ash: Most projects fall off a cliff after approval. Missing public documents don’t prove failure, but if outcomes aren’t available to communities or the board, that is the problem. You need goals versus actuals. If you are confident in your work, show your homework.

Martin: Project-level evaluations are not public, but aggregated lessons appear in IEG’s annual Results and Performance Review. With a public consultation now under way, I would urge everyone to use their voice, including by bringing project-level examples.

Representative from Recourse: How will IEG follow up on implementation, and how should communities be engaged in a review largely drafted in Washington?

Martin: The board and management have committed to modernising the framework, and IEG has a rigorous process for tracking progress and reporting back to the board

Aaron: Our ten communities are the evidence that recent policy changes have not delivered anything on the ground, and the revision must ensure that new investments do not tread the same path.

Smith: Reach communities directly through town halls and focus groups, and ensure that where grievances go unaddressed, there is remedy.

Laetitia: The revision must not be closed-door work. Consultation must go to the ground and include rural communities.

Ash: The cases we heard from Nigeria, Burkina Faso and the Philippines are more than illustrations of where the IFC falls short – they are concrete evidence of what needs to change and why it matters to the people living with the consequences. Ultimately, the measure of success will be what changes in practice: the investments the IFC chooses, the accountability it maintains after approval, and the outcomes communities can see and verify.